Leave a Message
We will call you back soon!
Your message must be between 20-3,000 characters!
Please check your E-mail!
More information facilitates better communication.
Submitted successfully!
We will call you back soon!
Leave a Message
We will call you back soon!
Your message must be between 20-3,000 characters!
Please check your E-mail!
Place of Origin: | China |
---|---|
Brand Name: | MCLLROY |
Certification: | CE/ISO |
Model Number: | MCL930 |
Minimum Order Quantity: | 1 Unit |
Price: | $4000-6000/ |
Packaging Details: | Nude,Fasten Packing ,2 or 3 Units loaded in one 40HQ |
Delivery Time: | 5-8 days |
Payment Terms: | 30% T / T in advance and 70% balance before shipment / 100% L / C at sight |
Supply Ability: | 100 Units / Month |
Engine Model: | Changfa 490 /Yun Nei 490 | RPM: | 2400 |
---|---|---|---|
Rated Power: | 42 KW | Emissions: | EU Stage II |
Rated Load: | 2000 Kg | Max. Travel Speed: | 28 Km/h |
Gear Box: | CVT 265 Torque Converter | Alex: | Small Hub |
Axle Base: | 2210 Mm | Brake: | Disc Brake |
Hydraulic Cycle Time - Lift: | ≤ 7 S | Min. Ground Clearance: | 290 Mm |
Wheel Base: | 1490 Mm | Reach At Max.Dump Height: | 3200 Mm |
Dump Reach: | 700 Mm | Overall Length - With Bucket: | 5300 Mm |
Overall Width: | 1820 Mm | Overall Height: | 2760 Mm |
Tyre Size: | 20.5-16 | Joystick: | Machanical |
Highlight: | Agriculture Wheel Loader,Wide Range Wheel Loader,Cutting Wheel Loader |
1. Products Description of MCLLROY Wheel Loader
In the construction industry, it is essential that equipment is capable of efficiently handling heavy-duty workloads. For instance, in the case of a loader, it is crucial that the bucket has a high capacity for shoveling material, while simultaneously ensuring that the loader remains stable during operation. Controls should be user-friendly, flexible, and easy to use, and equipment must have a low malfunction rate.
The MCLLROY Wheel Loader is an exceptionally crafted front-wheel loader, which comes with a single bucket, articulated structure, and hydraulic unloading capabilities. The machine has been meticulously designed and developed in accordance with the specific requirements and needs of users while also factoring in reference models that incorporate advanced structural features and technologies from both domestic and international markets.
2. Specification of MCLLROY Wheel Loader
MODEL | MCL 930 | |
ENGINE | Engine Model | Yun Nei 490 |
RPM | 2400 | |
Rated Power | 42 kW | |
Emissions | EU Stage II | |
WEIGHTS | Operating Weight | 3500 kg |
Rated Load | 1600 kg | |
BUCKETS | Bucket Capacities | 0.6-1.0 m³ |
TRANSMISSION | Max. Travel Speed | 28 km/h |
Gear Box | CVT 265 torque converter |
|
Alex | Small hub | |
Axle Base | 2210 mm | |
Brake | Disc Brake | |
HYDRAULIC SYSTEM | Hydraulic Cycle time - lift | ≤ 7 s |
DIMENSIONS(APPROXIMATE) | Min. Ground Clearance | 290 mm |
Wheel Base | 1490 mm | |
Reach at Max.Dump Height | 3200 mm | |
Dump Reach | 700 mm | |
Overall Length - With Bucket | 5300 mm | |
Overall Width | 1820 mm | |
Overall Height | 2760 mm | |
OPERATING SPECIFICATIONS | Tyre Size | 20.5-16 |
Joystick | Machanical | |
Min. turning radius | ≤ 7000 mm |
3.Details and advantages of MCLLROY Wheel Loader
1) The dual high and low-speed gearboxes and handles enable swift switching between work and travel modes.
2) The visual skylight design eases overhead shoveling and unloading operations.
3) With a wide field of view, the cab facilitates work in all directions and ensures safe walking.
4) The engineering tires boast a rubber content of over 38%, ensuring optimal durability and performance.
5) The external distribution valve and removable fuel tank streamline servicing and maintenance.
6) The buckets adhere to construction standards and are suitable for heavy-duty work.
4.Production lines of MCLLROY Wheel Loader
A complete production process mainly includes: material procurement-steel plate cutting-welding-spray painting -drying-assembly-inspection
Assembly:
Our factory has arranged seven steps for the assembly process, and with over a thousand parts in a loader, I will now elaborate on the assembly of the major components.
During the seventh step of assembly, the following tasks are completed: The tires and lighting are installed, and the wires are connected. Then, cooling water is added, and the engine is started to test the exhaust pipe. Air-con is installed, and the air is exhausted from the brake caliper, followed by the installation of the bucket.
Before testing, the workers need to check whether there is a short circuit and if the fuse has burnt out traces. They also need to see if all the pressure meters work normally. If the customer uses the loader in low temperatures (0 degrees or below), antifreeze is added to the water tank.
This step requires a total of four people to complete.
YJ Issued.